|
Menu
|
|
Authors
Call for Papers Submit Research Paper Submission Guidelines Review Process Scirj Indexing APC Editors Editorial Board Publication Ethics Publications Research Journal Special Issue Thesis Monograph Resources RSS & Feeds Subscribe
Scirj, Volume XIII [2025]
December Issue November Issue October Issue September Issue August Issue July Issue June Issue May Issue April Issue March Issue February Issue January Issue |
Scirj Volume VII, Issue I, January 2019 Edition ISSN: 2201-2796 Ogbikaya S. , Ike S. , Evbogbai M. J. E. Abstract: The analysis of the impact of integrating the power generated from Generation Company of Nigeria (GENCO), Nigeria Independent Power Project (NIPP) and the Independent Power Producers (IPP) into the existing 330kV transmission network is presented in this work. The analysis is carried out using ETAP 12.6 and MATLAB software for the existing and the proposed 330kV grid network. The result indicates that with the proposed integrated 330kV network, the power losses on each transmission lines reduced by 0.48MWwhich indicates 46% improvement on the existing 330kV transmission network and the voltage profile on each bus of the entire network improves from (0.66 – 1.13) per unit to (0.94 – 1.50) per unit. The result reveals that the integration of the proposed 330kV network, electricity supply in the national grid will be stable, reliable and adequate for sustainable development. Reference this Paper: Analysis of the Proposed Nigerian 330KV Integrated Network using ETAP 12.6 software by Ogbikaya S. , Ike S. , Evbogbai M. J. E. published at: "Scientific Research Journal (Scirj), Volume VII, Issue I, January 2019 Edition, Page 59-71 ". Search Terms: 330kV, Networks, Integrated, Power Generation, ETAP 12.6, MATLAB [Read Research Paper] [Full Screen] |