|
Menu
|
|
Authors
Call for Papers Submit Research Paper Submission Guidelines Review Process Scirj Indexing APC Editors Editorial Board Publication Ethics Publications Research Journal Special Issue Thesis Monograph Resources RSS & Feeds Subscribe
Scirj, Volume XIII [2025]
December Issue November Issue October Issue September Issue August Issue July Issue June Issue May Issue April Issue March Issue February Issue January Issue |
Scirj Volume VII, Issue IV, April 2019 Edition ISSN: 2201-2796 Ogbikaya S., Ike S. , Evbogbai M. J. E. Abstract: This work analyses the Economic Dispatch of the power generated from the Proposed Nigerian 330KV integrated network using ETAP 12.6 software and the result simulated by Matlab software. The result obtained revealed that not all the generating stations of the Proposed Nigerian 330KV network will be in circuit during optimal power flow. The generating stations that are out of circuit are thermal power stations. This reduces the cost of generation, waste as well as saves energy from the installed capacity of generation. The result further reveal that the real and reactive transmission losses in the entire network is reduced to 45.41MW and 257.98MVar respectively. Reference this Paper: The Economic Dispatch of the Power Generated from the Proposed Nigerian 330kV Integrated Network using ETAP 12.6 Software by Ogbikaya S., Ike S. , Evbogbai M. J. E. published at: "Scientific Research Journal (Scirj), Volume VII, Issue IV, April 2019 Edition, Page 168-174 ". Search Terms: Economic Dispatch, Optimal, Power, Flow, ETAP 12.6, Matlab [Read Research Paper] [Full Screen] |